Projekty EU
PLURAL
The European Research & Innovation project PLURAL funded by the Horizon 2020 programme aims to design, validate and demonstrate a palette of versatile, adaptable, scalable, off- site prefabricated Plug-and-Use kits. The objectives of the project will be achieved through international cooperation of 18 partners from 7 European countries with overall budget of 9,5 million EUR.
ICLIMABUILT
Project iClimaBuilt develops high-tech materials for insulation and energy storage of buildings, which will be adapted to different climatic conditions. The project started in March 2021 and will run for 48 months.
EENSULATE
Development of innovative lightweight and highly insulating energy efficient components and ssociated enabling materials for cost-effective etrofitting and new construction of curtainwall
P2ENDURE
P2ENDURE promotes evidence-based innovative solutions for deep renovation based on prefabricat- ed Plug-and-Play systems in combination with on-site robotic 3D-printing and Building Information Modeling (BIM), demonstrated and monitored at 10 real projects in 4 geo-clusters with EU-wide replication potentia
IMPRESS
Leverages on the potential of prefabrication by de- veloping a new range of easy to install panels, which reduces energy demand while preserving and/or improving the building aesthetics. The project started in June 2015 and will be closed in May 2019.
ECOXY
Project duration: 01 June 2017 to 30 November 2020 Bio-based, recyclable, reshapable & repairable (3R) fibre reinforced thermoset
composites.
RETROKIT
Project duration: From September 2012 to August 2016. The vision of the fp7 Retro Kit project was to develop and demonstrate multifunctional, modular, low cost and easy to install prefabricated modules in order to significantly increase the EU retrofitting rate and contribute to EU energy reduction commit-ments.
BRIMEE
Project duration: 2013-07-01 to 2017-06-30 The final aim of the project is to produce panels that can be well acceptable from building designers, architects, and the end users, thanks to their joint active in- volvement into the project, oncurring the develop- ment of a product representing a real marketable solution for the end users.
A2PBEER
Demonstrating existing and innovative retrofitting solutions in public buildingsand districts
ENVISION
The ENVISION H2020
Project: harvesting energy
from all building skins without it being visible
HOLISTEEC
Project duration: From October 2013 to September 2017. Holistic and Optimized Life-cycle Integrated SupporT for Energy-Efficient building design and Construction.
OSIRYS
Project duration: From June 2013 to May 2017. Forest based composites for façades and interior partitions to improve indoor air quality in new builds andrestoration.
LIFE
The project goal is to develop affordable, easy-to-install, and low-maintenance solutions for green architectural surfaces, making them accessible to everyone. The main innovation of the LIFE CAPT-TILE project lies in new clay tiles capable of hosting a layer of “artificial soil” to support plant growth.